As I had alluded to previously, the project I’m currently on has some very aggressive and fixed deadlines. The project got scoped down as much as possible but there have still been some trade-offs for productivity over maintainability. Some of it happened as a team decision – we discussed ways to compress the schedule and found some shortcuts to produce the needed functionality faster. But as new requirements came up in the process those shortcuts ended up causing much more work overall.

We knew that the shortcuts would cause more total work but we thought that the additional work could be deferred until after the initial deadline. The change of requirements meant that some of the automated testing that had been deferred was an issue. The initial manual testing plus the retest after the changes probably wasn’t much less than the effort to do the automated testing the first time. This specific shortcut wasn’t responsible for much of the time we shaved off the schedule, but when you’re doing similar things all over, the total cut was significant.

The key part of this tradeoff is that it assumed we would go back after the initial deadline and fill in the bits like we intended to instead of moving to something else (which is appearing more and more likely). Product management has a request for an additional feature in another existing application. This request has a similarly tight deadline, but is much smaller in scope (15 points) than the initial request(~120 points for the scoped down version). Picking up this request would mean that we end up further from the decision to defer portions of this and we’d be less likely to be able to deal with the technical debt in a timely manner that we accrued to the do the first request.

Since I’m still new at this job I’m not sure if this behavior is regular or since both of these items are related to the same event if it’s just a one-time thing. If this is a one-off problem then we can survive more or less regardless of how well we deal with it. If this is going to be a regular occurrence without an opportunity to resolve the problem, I feel like I’d need to take a different tactic in the future about how to work with the problem of short term needs.

This feels like the overall challenge of engineering: there are problems that need to be solved in a timeboxed way. We need to make good enough solutions that fit all of the parameters, be they time or cost. We can be productive and leave behind a disaster in our wake but succeed at business objectives, or we can build an amazing throne to software architecture but have the project fail for business reasons. The balance between the two is the where this gets really hard. If you’ve already been cutting corners day to day and the request to push the needle gets made, you have no resources left. The lack of an ability to really quantify the technical debt of an application in a systematic way makes it hard to project where we are on the continuum to others who aren’t working on the system daily.

Without this information, program-level decisions are hard to make and you end up with awkward mandates from the top that aren’t based on the realistic situation on the ground. Schedule pressure causes technical debt, testing coverage mandates cause tests that are brittle to just ratchet up the coverage, mandating technology and architectural decisions results in applications that just don’t work right.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s